Pond heating

Updating a system on a 6,000 gallon pond - page 4.

View of roofingROOFING.

Once the system was up and running then there was time to complete the additional parts of the installation.
This view shows the roofing that has now been added.

 
Another view of roofingROOFING COMPLETED.

This photo shows the completed roofing using 10mm Corotherm twinwall polycarbonate.

 
Boiler flueBOILER FLUE.

This photo shows a close up view of the connection of the flue to the boiler.
Fireproof tape was used, and they fire clay was added to make the final seal.

 
Boiler house door openBoiler house door closed
To complete the installation a door has now been fitted as can be seen in the photos above.
The door has open louvres so that air can enter the room, and will allow out hot air during the summer months. The door has been painted using Sadolin.
Brown guttering and down pipe has also been installed although it does not show in these photos.
 

WARNING. Care must be taken when building a system such as this unless you are conversant with this type of work. If you are not qualified to do the wiring yourself then consult an electrician. In Great Britain it is a criminal offence to connect the gas system yourself, and this must be done by a CORGI registered fitter. If you are doing this in any other country then do get expert advice and make sure that all the installation and work confirms to local regulations.